THE INITIAL VOLUME OF WATER POURED INTO A BAG OF DRY SOIL WAS 50ML AND THE AMOUNT THAT DRAINED THROUGH WAS 35ML. THE PERCENTAGE WATER CONTENT OF THE FULLY SOAKED SOIL IS THEREFORE
A. 46.7 B. 25.0 C. 20.0 D. 30.0 ✓ The answer to the question is: D. 30.0 The percentage water content of the fully soaked soil can be calculated using the formula: Percentage water content = (Amount of water retained / Initial…