COST OF PRODUCTION SCHEDULE

All the different cost concepts discussed are interrelated in a number of ways. They can easily be computed or calculated mathematically with the aid of their various formulae.

The cost concepts are better interpreted and understood when they are arranged in a schedule called the cost of production schedule. Any missing figure(s) can be calculated or filled up using other cost values and their respective formulae.

compress1664910379457

 

Mathematical Approach to Costs

Example 1: Complete the following cost schedule and answer the questions that follow.

cropped6071317277122060696

 

 

  1. At what output is AC at the minimum?
  2. At what output is MC at the minimum?
  3. At what output does AC start increasing?
  4. At what output does MC start to be greater than AC?
  5. What is the maximum output?

cropped611292505921103843

 

 

TC = AC x output

a = output 3

TC = AC x output = 6 x 3

TC or ‘a’ = 18.

 

b = TC = 6 × 5

b= TC = 30.

 

c = AC = TC ÷ Output = 14÷2 = 7.

 

d = AC = 20÷4 = 5.

 

f = MC at output 2

TC 2 – TC = 14 – 8 = 6.

 

g= MC at output 3 = 18 – 14 = 4.

 

h= MC at output 4 = 20 – 18 = 2.

 

i= MC at output 5 = 30 – 20 = 10.

 

j = MC at output 6 = 48 – 30 = 18.

 

  1. Output 4 units.
  2. Output 4 units.
  3. Output 5 units.
  4. Output 5 units.
  5. Maximum output is 6 units.

 

From the cost schedule in the table below, calculate the average variable cost (AVC), average total cost (ATC) and marginal cost (MC) of the firm.

cropped1485786257677899105

 

cropped8985749821974650578

 

cropped7004907562571871487

 

cropped531044746484248602

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *

Keep your body looking fit and healthy from the comfort of your home with the body sculpture twist stepper. Full length hd ebony porn | porninblack. Real shemale trans porno.